Case Study: PT General Energy Bali

Transaction Background

PT General Energy Bali
  • PT General Energy Bali (GEB) is an independent power producer which is developing a 380 MW IPP at Celukan Bawang - North Bali, to meet the needs of the underserved Java-Bali grid
  • GEB has secured land for an two additional 300 MW blocks
  • GEB has executed a 30 year PPA with PLN
  • China Huadian, as the 51% strategic investor in the project, is the taking EPC / O&M roles as well

Coal jetty able to accommodate 50,000 DWT cargo ships
Covered coal yard
Integrated full-DCS control architecture
Seawater-based flue-gas desulphurization system
Micro-oil ignition system
Low emission design

Project Overview

Key Statistics
Company Name PT General Energy Bali
Location Bali, Indonesia
Capacity 380 MW
Feedstock Coal
Strategic Investor China Huadian
Deal Size US$560m